Technical data of the Fürwigge dam

Water management
Dam target above sea level438,98 m
Water surface at full water level0.18 km2
Storage capacity1.67 millionm3
Catchment area4.58 km2
Barrier structure
Construction time1902-1904
Height above valley floor24,6 m
Height above foundation base29,1 m
Height above water level29,1 m
Height of the structure crown439,55 m
Structure volume26.000m3
Crown length166 m
Radius of curvature120 m
Power station
Capacity per turbine33-160 l/s
Power output22 kW